Seaport-e Past Performance

The matrix below represents the functional areas in which JAGGY, Inc. has past performance experience.

 Geographic Zone
Functional Area1234567
3.1 R&D Support X     
3.2 Engineering Support XX    
3.3 Modeling       
3.4 Prototyping       
3.5 System Des Doc/Tech Data XX  X 
3.6 Software X     
3.7 RM&A       
3.8 HF Engineering Support       
3.9 System Safety       
3.10 CM Support X     
3.11 QA Support       
3.12 IS / IA / IT XX  X 
3.13 Ship Inactivation/Disposal       
3.14 Interoperability/T&E/ Trials       
3.15 Measure Facilities / Ranges       
3.16 Acquisition Logistics       
3.17 Supply & Provisioning       
3.18 Training XX  X 
3.19 In-Serivce Eng       
3.20 Program Support XX  X 
3.21 Administrative Support       
3.22 Public Affairs X     
Print